We – EPG Team the greatest gearbox & motors , torque limiter couplings and gears manufacturing facility in China with 5 diverse branches. For much more information: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
Attributes&colon
one&rpar Its novel hexagonal cross section structure features light dead weight and strong bearing capacity&semi
two&rparIts hoisting&comma luffing&comma swing&comma telescopicing and other mechanisms adopt manual proportional control and hydraulic drive&comma featuring easy and flexible operation&comma stable and reliable work&comma as well as stepless speed regulation&semi
three&rparSuch safety devices as relief valve&comma balance valve&comma hydraulic lock and brake valve are equipped to prevent oilway overload and avoid accidents due to pipe fracture&semi
four&rparIt adopts the flow saturation resistance technology&comma with the flow irrelevant to the load&comma so that the combined movements could have the stability and synchronization effectively ensured&semi
five&rparThree-axle dedicated chassis&comma broad vision&comma as well as luxurious and comfortable decorations&semi
six&rparIt adopts a FAST gearbox and a 6×4 drive plus easy and flexible hydraulic power steering&semi
seven&rparSuch safety devices as torque limiter and height limit device&comma as well as a complete lighting system aAutomatically resets with no difficulties Can be utilized in blend with each and every sort of push A variety of normal products are availablere equipped to ensure safe and reliable operation&comma and facilitate operation at night&semi
Complex Parameters
Type |
Ser&interval No&interval |
Product |
Unit |
Price |
---|---|---|---|---|
Wor ept functionality |
one |
Max&period rated lifting weight × wor ept radius |
kg&periodm |
50000×3&period0 |
two |
Max&period of time lifting torque of basic boom |
kN&periodm |
1764 |
|
three |
Max&period of time lifting torque of longest main growth |
kN&periodm |
940&period8 |
|
four |
Max&period lifting peak of longest major boom |
m |
42&period1 |
|
5 |
Max&period lifting peak of jib |
m |
fifty eight&period3 |
|
Proportions |
six |
Define proportions &lparL×W×H&rpar |
mm |
13300×2750×3650 |
seven |
Distance among outriggers &lparlongitudinal × transversal&rpar |
mm |
5920×6900 |
|
eight |
Main increase length &lparcompletely retracted – fully extended&rpar |
m |
11&period1~forty two |
|
nine |
Jib length |
m |
9&period5&comma16 |
|
10 |
Major boom angle of elevation |
° |
-2~eighty |
|
11 |
Swing variety |
|
360°continuously |
|
Wor ept pace |
12 |
Max&periodspeed of one rope on the drum of principal winch |
m&solmin |
a hundred thirty |
13 |
Increase extension time |
s |
95 |
|
fourteen |
Growth derric ept up time |
s |
fifty |
|
fifteen |
Swing speed |
r&solmin |
~two |
|
Mass |
16 |
Total vehicle kerb mass |
kg |
40870 |
seventeen |
Front axle load |
kg |
15000 |
|
18 |
Rear axle load |
kg |
26000 |
|
Traveling |
19 |
Max&interval traveling velocity |
km&solh |
76 |
twenty |
Max&time period gradeability |
&percnt |
40 |
|
21 |
Min&time period turn radius |
m |
twelve |
|
22 |
Min&interval ground clearance |
mm |
280 |
The use of first products manufacturer’s (OEM) component quantities or logos , e.g. CASE® and John Deere® are for reference reasons only and for indicating merchandise use and compatibility. Our firm and the shown replacement areas contained herein are not sponsored, accepted, or created by the OEM.